With CSI-Coop, a property management company, BES developed numerous projects to increase residents’ comfort and to reduce energy waste which eventually will reduce utility bills for the owner.
CSI-Coop currently manages [7] buildings in Massachusetts, and BES is honored to conduct energy audit, project development, installation, and continuous monitoring for tracking the new upgrades’ performances. In 2021, BES successfully completed [6] out of [11] projects. The [6] projects are worth of $478,000. And the other [4] projects are currently pending for review by utility for project funding.

Facility : Blue Ledge Apartment
Location: Roslindale, MA
Applied Efficiency Measure
- Smart Thermostat Implemtation (pending)
- HVAC System Upgrade (pending)
- Lighting Upgrade
Project Description
At Blue Ledge, BES developed three projects: smart thermostat implementation, HVAC, and lighting upgrade.
Utilizing our savings calculator, BES proposed utility savings in both gas and electric worth of around $16,000 per year from new programmable thermostat implementation.
For HVAC system upgrade, BES also used savings calculator to predict gas savings from upgrading the existing roof top unit insulation.
Including generating savings calculation for the thermostat and HVAC upgrade projects, BES submitted proposals to utility programs to apply project cost funding.
Since the building was built in 1995, all lighting fixtures are outdated, so BES proposed and completed upgrading lightings to new LED fixtures.
Project | Smart Thermostat | HVAC | Lighting | Total ($) |
Cost ($) | ~$126,000 | ~$26,800 | ~$35,000 | ~$188,000 |

Facility : Castle Cove Apartment
Location: South Boston
Applied Efficiency Measure
- Smart Thermostat Implemtation
- HVAC System Upgrade
Project Description
At Castle Cove, BES developed two projects: smart thermostat implementation, HVAC upgrade.
Utilizing our savings calculator, BES proposed utility savings in both gas and electric worth of around $20,070 per year from new programmable thermostat implementation.
For HVAC system upgrade, BES also used savings calculator to predict gas savings from upgrading the existing roof top unit insulation.
Including generating savings calculation for the thermostat and HVAC upgrade projects, BES submitted proposals to utility programs to apply project cost funding.
Project | Smart Thermostat | HVAC | Total ($) |
Cost ($) | ~$110,000 | ~$27,000 | ~$137,000 |

Facility :Everett Villa Apartment
Location: Everett, MA
Applied Efficiency Measure
- Builidng Control System (pending)
- HVAC System Upgrade (pending)
- Lighting Upgrade
Project Description
At Everett Villa, BES developed three projects: Building Control System, HVAC, and lighting upgrade.
Utilizing our savings calculator, BES proposed utility savings in both gas and electric worth of around $16,000 per year from new programmable thermostat implementation.
For HVAC system upgrade, BES also used savings calculator to predict gas savings from upgrading the existing roof top unit insulation.
Including generating savings calculation for the thermostat and HVAC upgrade projects, BES submitted proposals to utility programs to apply project cost funding.
Since the building was built in 2000, all lighting fixtures are outdated, so BES proposed and completed upgrading lightings to new LED fixtures.
Project | Building Control | HVAC | Lighting | Total ($) |
Cost ($) | ~$150,000 | ~$23,000 | ~$58,700 | ~$231,700 |

Facility : Franklin Park Villa Apartment
Location: Jamaica Plain, MA
Applied Efficiency Measure
- Lighting Upgrade
Project Description
At Franklin Park Villa, BES developed one project: lighting upgrade.
Since the building was built in 2002, all lighting fixtures are outdated, so BES proposed and completed upgrading lightings to new LED fixtures.
Project | Lighting | Total ($) |
Cost ($) | ~$26,000 | ~$26,000 |

Facility : Friendly Garden Apartment
Location: Revere, MA
Applied Efficiency Measure
- Lighting Upgrade
Project Description
At Friendly Garden, BES developed one project: lighting upgrade.
Since the building was built in 1985, all lighting fixtures are outdated, so BES proposed and completed upgrading lightings to new LED fixtures.
Project | Lighting | Total ($) |
Cost ($) | ~$121,300 | ~$121,300 |